(2024-08-30). Xinjiang completes 750 kV UHV power transmission project. ecns.cn A 750 kilovolt ultra-high voltage (UHV) power transmission project, key to building a power transmission loop line around the Tarim Basin, in northwest China's Xinjiang Uyghur Autonomous Region has been completed on Wednesday.
(2024-08-29). Iraq shoots down Turkish drone over Kirkuk. middleeasteye.net Iraq shoots down Turkish drone over Kirkuk | Baghdad hit a Turkish drone following the signing of a new security cooperation deal with Ankara this month | | A TAI Aksungur, an unmanned aerial vehicle developed by Turkish Aerospace industries, is displayed during the International Paris Air S…
2024-08-30 11:22:55 | by | 4 | 0 | 2 | 2 | 0 ∧